Today after 3 weeks 3 days the FDC Contractor returned to our estate – to be fair ‘Frank’ did spend 16 minutes as opposed to the 4.5 minutes he had done last time, and made a somewhat better job that ‘he’/they’ had done before.
Still no where ‘perfect’ but at least acceptable for a while – we still have other ‘issues’ with the rest of the area and hopefully this will at some stage be addressed.
I also saw that the grass along the ‘Bower’ at Briggate East was done – a large lorry with a massif cutter on its ‘crane’ did ‘some sort of job – but left a ‘hedgehog’ by the railings.
-
Statistics
- Whittlesey, GB9°Feels like: 5°CRain Shower5:42 am6:28 pm BST
Wind: 27km/h SSE
Humidity: 88%
Pressure: 976.3mbar
UV index: 1FriSatSun13°C / 5°C
15°C / 4°C
15°C / 7°C